{"id":3173,"date":"2026-02-19T17:14:14","date_gmt":"2026-02-19T20:14:14","guid":{"rendered":"https:\/\/alselec.com\/uncategorized-en\/ensayos-fat-para-nuevo-variador-mt-media-tension-de-pae\/"},"modified":"2026-10-25T17:19:58","modified_gmt":"2026-10-25T20:19:58","slug":"fat-new-medium-voltage-drive-pae","status":"publish","type":"post","link":"https:\/\/alselec.com\/en\/news\/fat-new-medium-voltage-drive-pae\/","title":{"rendered":"FAT tests for PAE\u2019s new MV (Medium Voltage) drive"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"3173\" class=\"elementor elementor-3173 elementor-2988\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8dc6f69 e-flex e-con-boxed e-con e-parent\" data-id=\"8dc6f69\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f6cc360 elementor-widget elementor-widget-image\" data-id=\"f6cc360\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"868\" height=\"487\" src=\"https:\/\/alselec.com\/wp-content\/uploads\/2026\/02\/img-pae.jpg\" class=\"attachment-full size-full wp-image-3174\" alt=\"\" srcset=\"https:\/\/alselec.com\/wp-content\/uploads\/2026\/02\/img-pae.jpg 868w, https:\/\/alselec.com\/wp-content\/uploads\/2026\/02\/img-pae-300x168.jpg 300w, https:\/\/alselec.com\/wp-content\/uploads\/2026\/02\/img-pae-768x431.jpg 768w\" sizes=\"(max-width: 868px) 100vw, 868px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-33cd841 e-flex e-con-boxed e-con e-parent\" data-id=\"33cd841\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-197c428 elementor-widget elementor-widget-text-editor\" data-id=\"197c428\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">We have completed the FAT (Factory Acceptance Testing) alongside the Pan American Energy team for the integration of the new medium-voltage drive for the Brandsen\u2013Campana oil pipeline into the plant\u2019s control and supervision system.<\/span><\/p><p><span style=\"font-weight: 400;\">The Brandsen\u2013Campana pipeline is a strategic piece of infrastructure that transports crude oil\u2014produced in the south and arriving by sea at Puerto Rosales\u2014from AXION energy\u2019s storage terminal in Brandsen to its refinery in Campana. Both locations are key facilities for the prominent oil and gas company Pan American Energy (PAE). The pipeline spans over 166 km, with approximately 70% of its route running parallel to Provincial Route 6 and 30% passing through rural areas, transporting nearly 110,000 barrels per day. <\/span><\/p><p><span style=\"font-weight: 400;\">In this project, we had the opportunity to provide our comprehensive engineering and control system programming solution. True to our commitment, we modernized and improved the system to ensure the integrity of the supply chain, utilizing software tailored for the Oil &#038; Gas industry. <\/span><\/p><p><span style=\"font-weight: 400;\">We thank the Pan American Energy team for their trust and kindness throughout our collaboration. Their willingness to work toward our goal of maximizing access to innovative technologies is both gratifying and motivating for us. They serve as a driving force for our commitment to continuous improvement and the ongoing development of the quality of our work processes, in accordance with current standards.  <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>We have completed the FAT (Factory Acceptance Testing) alongside the Pan American Energy team for the integration of the new medium-voltage drive for the Brandsen\u2013Campana oil pipeline into the plant\u2019s control and supervision system. The Brandsen\u2013Campana pipeline is a strategic piece of infrastructure that transports crude oil\u2014produced in the south and arriving by sea at [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3174,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[39],"tags":[],"sector":[],"class_list":["post-3173","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/posts\/3173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/comments?post=3173"}],"version-history":[{"count":3,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/posts\/3173\/revisions"}],"predecessor-version":[{"id":3236,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/posts\/3173\/revisions\/3236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/media\/3174"}],"wp:attachment":[{"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/media?parent=3173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/categories?post=3173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/tags?post=3173"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/alselec.com\/en\/wp-json\/wp\/v2\/sector?post=3173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}